Posted by Kent Steen

The leadership of Church of Our Savior has determined that our best course of action is to build our multi-purpose (MP) building in phase I instead of the Chapel.  This decision was made due to the unanticipated growth in costs driven by the current building boom in our area.  More specifically, there is a shortage of skilled sub-contractors and, in consequence, their labor rates have been driven up.

The exterior and interior of the MP building have been revised to reflect a more primary role in the life of our church, with the emphasis on creating a suitable worship environment initially.  The exterior, as shown in the adjacent drawings, will have better definition as a house of worship with a steeple suggested on one side.  The interior is also being revised in order to provide a more formal worship environment.   Drawings for this will be posted when available.  The chapel design will remain unchanged for Phase II.

Revised exterior design of MP building

Revised exterior design of MP building

Share