Posted by Kent Steen

Update: Taken at mid-day showing roof covered and cross in place!

The second floor Insulated Concrete Forms (ICF) walls have been erected and ready mix poured to complete the process. Pre-fabricated trusses for the roof have been lifted by a crane and fastened into place. The adjacent images show the building status on Friday, May 26, 2017. The inside pictures show a view of the trusses from the second story.
Overall, construction is on track and proceeding according to the contractor’s schedule.

Exterior View with Roof Trusses in place